When Developers Blame Technical Debt

Technical debt claims often arise when a software project is running late, a supplier requests additional funding or a seemingly simple change takes much longer than expected. Your developer explains that problems in the existing code are making progress difficult, but you may have no reliable way to judge whether that explanation is reasonable.

Technical debt can genuinely make software harder to maintain and improve. However, it can also become a convenient explanation for problems caused by unclear requirements, weak planning or inadequate development practices. Before approving more work, you need to understand what is happening, what evidence supports the claim and whether the proposed remedy addresses the real problem.

Takeaways

  • Technical debt claims should identify specific limitations and explain their business consequences.
  • Request evidence from completed development work, testing and technical analysis before approving substantial remediation.
  • Distinguish genuine technical debt from unclear requirements, weak estimates, skills gaps and delivery problems.
  • Challenge recommendations constructively and compare reasonable alternatives before committing additional money.
  • An independent review can help management resolve conflicting explanations and make better-informed decisions.

Table Of Content

What Does the Developer Actually Mean?

When a developer says your software has technical debt, they are describing limitations in its design, implementation or supporting development practices that make future changes more difficult.

That might include complicated code, poorly separated components, insufficient automated tests or outdated dependencies.

Technical debt is not necessarily evidence that somebody made a bad decision.

A business may have deliberately accepted a temporary technical compromise to deliver an important capability sooner. Other debt can emerge as requirements change or developers learn more about the system.

Software expert Martin Fowler’s Technical Debt Quadrant distinguishes between deliberate and inadvertent debt, as well as prudent and reckless decisions.

The distinction is useful because not every technical limitation requires immediate remediation.

Turn the Explanation Into a Problem

A statement such as “the codebase has too much technical debt” is not enough to support a business decision.

It describes a concern without identifying what it means for the organisation.

A more useful explanation would be:

“The customer pricing rules are duplicated across four components. Updating one pricing rule requires changes in several places, increasing the likelihood of inconsistent results and additional testing.“

That statement identifies a particular technical problem and explains why it might affect development effort.

It gives management something to investigate.

I would ask the developer to explain the affected business function, the specific limitation and the consequences of leaving it unresolved.

The discussion should move from technical terminology to observable behaviour.

Ask Why the Debt Exists

Understanding the history can help determine an appropriate response.

Perhaps a development team made a reasonable shortcut to meet an important customer deadline. The software worked, but the team expected to improve the implementation later.

Alternatively, the application may have developed without consistent technical leadership, adequate testing or agreed coding practices.

Those situations can produce similar technical symptoms but suggest different management actions.

I would avoid starting with who is responsible for creating the debt.

That may become relevant if supplier performance or contractual obligations are being reviewed, but the immediate question is what the business needs to do now.

Blame rarely improves the quality of technical evidence.

CEO discussing a developer's technical debt explanation with an independent technology consultant.
Understanding Developer Technical Debt Claims

Ask for Evidence Before Approving Work

A credible technical debt claim should describe a specific limitation, explain how it affects the software and provide evidence that the problem is real.

The evidence does not have to be complicated.

A developer might demonstrate that changing one function requires edits across several unrelated components.

They might show a repeated defect, an automated test that cannot run reliably or an unsupported dependency preventing a necessary upgrade.

The important issue is whether someone suitably qualified can examine the evidence and reach a reasonable conclusion.

Ask for Specific Examples

I would start with four questions:

  1. Where is the problem? Identify the application, component or development process affected.
  2. What happens because of it? Describe the additional work, operational risk or delivery constraint.
  3. What evidence supports that explanation? Provide relevant examples from development work, testing, system behaviour or technical analysis.
  4. What would improve if we fixed it? Explain the expected outcome rather than simply recommending cleaner code.

A developer should be able to explain these points in language that management can understand.

They may need time to investigate before providing definitive answers.

That is reasonable, particularly when dealing with older software or a complex architecture.

What matters is distinguishing established facts from assumptions that have not yet been tested.

Review Recent Development Work

Completed development tasks can provide useful evidence.

Suppose the team recently implemented a relatively small change to customer invoicing.

The developer reports that the work took longer because the invoicing logic is shared with several other functions.

Ask what additional work was required.

Did the team need to modify unrelated components? Were defects introduced? Did existing automated tests fail? Was extensive manual checking necessary?

The answers help establish whether a technical limitation affected that particular task.

However, avoid treating one difficult change as proof that the entire application is poorly designed.

The evidence needs to be considered in context.

An unusually complicated business requirement can take substantial effort even in a well-maintained application.

Evaluate Automated Code Reports

Software analysis tools can identify code quality issues, complexity, duplication and maintainability concerns.

For example, SonarQube’s metrics documentation describes how its technical debt measure estimates the effort associated with correcting identified maintainability issues.

That information can support a technical assessment.

However, the estimated effort required to address code quality findings is not necessarily the same as the actual business impact of those problems.

A large collection of warnings in rarely modified code may have limited immediate commercial relevance.

A smaller problem in a frequently changed payment component may be much more important.

I would ask the development team to explain which findings are relevant to the business decision.

A technical report should support professional judgement, not replace it.

Use a Technical Debt Evidence Matrix

When several technical debt claims are being made, a simple evidence matrix can help management separate genuine problems from assumptions.

The matrix should connect technical concerns with business consequences and proposed actions.

It should also make clear where further investigation is required.

Compare Claims With Evidence

The following example is illustrative. It shows how management might examine claims made by an internal developer or external software supplier.

Developer’s claimEvidence to requestBusiness impactProposed remedyDecision
Billing code is too complicatedAffected modules and recent change examplesSlower billing improvementsTargeted refactoring and testsValidate scope
Database design causes delaysQuery performance results and investigation recordsSlow reporting or additional development effortDatabase improvementsAssess evidence
Tests are unreliableTest results and repeated failuresLonger release preparationRepair critical testsConfirm priority
Framework is outdatedVersion details and support statusUpgrade difficulty or security exposureUpgrade dependenciesAssess urgency
Architecture needs replacingSpecific limitations and affected requirementsConstraints on future developmentMajor redesignCompare alternatives
All code must be rewrittenEvidence that targeted changes are unsuitablePotentially substantial investmentFull rebuildRequire independent scrutiny

The matrix provides a basis for discussion rather than automatically approving or rejecting technical recommendations.

For each claim, management should understand what is known, what remains uncertain and what decision is required.

Separate Facts From Assumptions

A finding should distinguish between evidence and interpretation.

For example:

Observed fact: A change to the invoicing calculation required modifications in four separate modules.

Technical interpretation: Duplicated logic may increase maintenance effort and the risk of inconsistent behaviour.

Business consequence: Future pricing changes could require additional testing and development work.

Recommendation: Investigate whether consolidating the duplicated logic would make future changes safer.

Each statement serves a different purpose.

The first describes an observation. The second interprets its technical meaning. The third connects it to the business. The fourth proposes an action.

I find this separation particularly valuable when developers and executives are discussing technical problems.

It reduces the risk of treating an opinion as an established fact.

Record What Remains Uncertain

An evidence matrix should not imply that everything has been verified.

If the technical team has not examined an important dependency, say so.

If an estimate depends on assumptions about future development, record those assumptions.

If the organisation lacks reliable delivery records, avoid inventing precision.

A credible assessment acknowledges uncertainty while explaining how management can reduce it.

The aim is to improve confidence in the decision, not create a document that looks more certain than the evidence allows.

Technology consultant and business leaders reviewing evidence supporting software technical debt claims.
Reviewing Technical Debt Evidence

Is Technical Debt Really Causing Delays?

Technical debt can make software development slower and less predictable.

However, it is not the only explanation for missed deadlines or rising development effort.

Before accepting a supplier’s explanation, management should investigate other contributing factors.

This does not mean assuming the developer is being dishonest.

It means examining the delivery system as a whole.

Check the Quality of Requirements

Developers cannot provide reliable estimates when the business has not clearly defined what it needs.

A request that appears simple may contain business rules, exceptions or integration requirements that were not initially understood.

For example, management might request a new customer discount feature.

The development team later discovers that discounts affect recurring billing, refunds, reporting and existing customer agreements.

The additional work may be caused by incomplete requirements rather than technical debt.

I would examine what was known when the estimate was prepared and how new information was handled.

If requirements were unclear, improving the planning and discovery process may be more valuable than changing the software architecture.

Examine the Estimates

Software estimates involve uncertainty.

A complex development task may encounter unexpected technical problems even when the team is competent and the code is maintainable.

However, estimates should be based on reasonable assumptions and informed by previous work.

Ask whether developers considered the existing system before making commitments.

Were they familiar with the affected components? Did they identify important dependencies? Were assumptions explained?

If estimates are consistently optimistic, the problem may involve planning practices rather than underlying code quality.

Technical debt could still contribute, but the business needs to understand both issues.

Consider Skills and Experience

A development team may struggle because it lacks experience with the technologies used in an existing application.

For example, a company specialising in one framework might take over a system built using a different technology stack.

The developers may need time to understand its architecture and development practices.

That does not automatically mean the existing software is unsuitable.

It could mean the team requires additional expertise or a more realistic familiarisation period.

Before approving a major remediation programme, ask whether the proposed work addresses a genuine technical limitation or compensates for an experience gap.

Review Delivery Practices

Poor development practices can create delays even when the code itself is reasonably maintainable.

Common problems include excessive work in progress, frequent interruptions, inadequate testing and unclear responsibility for approving changes.

A team may spend weeks switching between unfinished tasks and then attribute its lack of progress to technical debt.

Those are different problems requiring different remedies.

The Google SRE guidance on operational toil provides a useful distinction between repetitive operational work and engineering activities that create lasting improvements.

Although operational toil is not identical to technical debt, the guidance demonstrates why repeated manual work needs careful analysis rather than a generic technical explanation.

A Project Delivery assessment may be more relevant when planning, priorities and development processes appear to be the main constraints.

Recognise Multiple Causes

Sometimes the answer is not one problem or another.

A team may be working with a difficult codebase, unclear requirements and repeated interruptions.

Those factors can reinforce each other.

Improving only the code may produce limited benefit if the underlying delivery practices remain unchanged.

Equally, introducing better project management will not remove a genuine technical limitation that makes every release risky.

An effective review should identify the contributing causes and recommend actions that address them together.

Challenge the Proposal Without Blame

Business leaders should be able to question technical recommendations without creating unnecessary conflict with developers.

A request for evidence is not an accusation of incompetence.

It is a normal part of approving expenditure and managing business risk.

The quality of the conversation can make a substantial difference to the information management receives.

Ask Questions That Invite Evidence

Suppose your development company explains that technical debt will require an additional six weeks of work.

You could respond by asking:

  • Which specific problems are responsible for the additional effort?
  • When did the team first become aware of them?
  • Which planned deliverables are affected?
  • What work has already been completed to investigate the issues?
  • Which parts of the proposed remediation are essential?
  • What alternatives have been considered?
  • What happens if the work is postponed?
  • How will we know the changes have improved the situation?

These questions are direct without being confrontational.

They encourage the supplier to provide information that supports an informed decision.

Give Developers Room to Explain

Developers sometimes struggle to explain technical limitations to non-technical executives.

A complicated architecture may be genuinely difficult to describe without introducing specialist terminology.

That does not make the concern invalid.

I would encourage the technical team to explain one concrete example before attempting to describe the entire problem.

For instance, demonstrate why a particular business change requires modifications across several components.

Then connect that behaviour to additional effort, risk or delivery uncertainty.

A practical example can be more useful than a lengthy technical presentation.

Avoid Demanding Impossible Certainty

Management has a right to expect reasonable estimates and clear explanations.

However, it should not demand guarantees that technical work cannot realistically provide.

Developers may need to investigate the problem before they can estimate remediation accurately.

Sometimes a short, controlled assessment is the most sensible first step.

Agree on what the investigation should establish, how much effort is authorised and what information will be provided afterwards.

This creates accountability without forcing the team to invent certainty.

Keep the Conversation Constructive

My guiding principle is people before technology.

The people responsible for maintaining your software often understand its limitations better than anyone else.

Their concerns deserve attention, even when management needs to challenge the conclusions.

At the same time, technical expertise does not remove the need for commercial accountability.

A productive discussion combines the developer’s understanding of the system with management’s understanding of business priorities and risk.

The goal is to reach a defensible decision, not win an argument about who understands technology better.

Assess the Proposed Technical Fix

Once a technical debt problem has been supported by evidence, the next step is to assess the proposed remedy.

Identifying a genuine problem does not automatically justify the first recommended solution.

There may be several reasonable ways to address the limitation, each with different costs, benefits and risks.

Compare Practical Alternatives

The options could include:

Leave the debt in place: Appropriate when the affected component rarely changes and the consequences remain manageable.

Improve the affected code: Targeted refactoring may make a particular component easier to maintain without replacing the application.

Improve testing or documentation: Where the main difficulty concerns confidence or knowledge, better supporting practices may be sufficient.

Replace a limited component: An isolated part of the application may need replacement while the remaining system continues operating.

Rebuild the application: Appropriate only when the evidence supports a broader replacement and less disruptive approaches are unsuitable.

A developer may strongly prefer one option because of its technical advantages.

Management must also consider the commercial consequences, planned business changes and operational exposure.

Ask What the Work Will Deliver

Remediation proposals should describe an outcome that can be evaluated.

“Improve the architecture” is too vague to justify a substantial investment.

“Separate the customer pricing rules so changes can be tested independently from invoicing” is more useful.

The second statement identifies a specific technical objective and an expected improvement.

The business can then ask how the development team intends to demonstrate that the objective has been achieved.

A proposed change does not need to produce an immediate cash saving to be worthwhile.

Reducing material operational risk or enabling an important business requirement may provide sufficient justification.

However, the expected benefit should be explicit.

Evaluate the Wider Consequences

Technical remediation may require changes to databases, integrations, testing procedures or deployment arrangements.

Even a targeted improvement can introduce risk if it affects critical business processes.

Ask how the team intends to test the work and manage the transition.

Consider whether the existing application must continue operating while changes are made.

Where appropriate, discuss whether the work can be delivered in smaller, independently testable increments.

I would be cautious about committing to a large programme of internal improvements without clear milestones and an agreed way to assess progress.

A technically sound proposal still needs a practical delivery plan.

Do Not Approve a Rebuild Automatically

Developers may recommend rewriting an application because the existing structure makes development difficult.

That recommendation can be justified in some circumstances.

However, a rebuild also introduces the challenge of reproducing existing business functions, integrations, data relationships and operational behaviours.

The business should understand which technical constraints make continued development unreasonable.

It should also consider whether targeted improvements could address the most important limitations.

An independent Technology Strategy engagement may be useful when the decision involves broader modernisation, major investment or the long-term direction of the company’s software.

Test the Proposed Remedy Safely

When the evidence is incomplete or the proposed investment is substantial, a limited technical exercise may help establish whether the recommended approach is practical.

The objective is to test the specific concern without introducing unnecessary operational risk.

A useful trial should answer a defined question.

Choose One Representative Problem

Suppose developers believe that duplicated pricing logic is responsible for repeated defects.

A controlled exercise could involve improving one affected component, adding relevant tests and checking whether the change reduces complexity.

The technical team should explain what will be changed, how it will be tested and what would count as a successful outcome.

The work should take place in an appropriate development or test environment.

Production changes should follow normal approval and release procedures.

Record What the Team Learns

After the exercise, review the findings.

Did the team confirm the original problem? Did the proposed improvement work? Were new constraints discovered? Did the change affect other components?

Sometimes the investigation will show that the proposed solution is reasonable.

Other times, it may reveal that a different approach would be more effective.

Both outcomes provide useful information.

The point of a trial is to reduce uncertainty before management commits to a larger programme.

Avoid Overstating the Result

A successful improvement to one component does not prove that the same approach will work throughout the entire application.

Likewise, an unsuccessful trial does not automatically demonstrate that remediation is impossible.

The technical team should explain how representative the exercise was and what conclusions can reasonably be drawn.

I would use the results to refine the scope, risks and delivery plan.

The objective is better decision-making, not producing an impressive demonstration that overlooks unresolved problems.

Decide Whether the Claim Is Credible

After examining the available evidence, management should be able to classify the claim and identify an appropriate next step.

The conclusion does not need to be a simple choice between believing or rejecting the developer.

A more useful approach recognises the quality of the evidence and the remaining uncertainty.

Four Possible Assessment Outcomes

Assessment outcomeWhat it meansManagement action
SupportedEvidence demonstrates a specific technical limitation and credible business consequenceEvaluate the proposed remediation
Partially supportedThe limitation exists, but its impact or proposed scope remains uncertainRequest targeted investigation
UnsupportedAvailable evidence does not establish the claimed causeExamine other explanations
Not yet assessedThe necessary information or expertise is unavailableEstablish a suitable assessment scope

This classification should not be confused with contractual acceptance or a formal legal determination.

It is a practical way to guide management decisions.

A supported claim may still lead to a decision to postpone remediation.

An unsupported claim may become supported when new evidence emerges.

The assessment should remain open to credible information.

Record the Decision

Once management has considered the findings, record what has been decided.

That might involve approving a limited repair, requesting further investigation, changing delivery practices or accepting a known limitation.

Identify who is responsible for implementing the decision and when the outcome will be reviewed.

A short decision record is often sufficient.

The important point is to prevent the same unresolved concern from returning repeatedly without any progress.

Business executives evaluating evidence and remediation options before approving technical debt work.
Making a Technical Debt Decision

When an Independent Review Makes Sense

An independent review can be valuable when technical debt claims affect substantial financial commitments or management cannot confidently evaluate the evidence.

It can also help when the relationship between the business and its development supplier has become strained.

The reviewer should approach the situation without assuming that the developer is right or wrong.

Know When to Seek a Second Opinion

Consider an independent assessment when:

  • Technical debt is repeatedly cited as the reason for missed commitments.
  • A supplier requests substantial additional time or funding.
  • Different developers provide conflicting technical explanations.
  • Management receives technical reports without clear business implications.
  • A proposed rebuild depends on claims that have not been independently verified.
  • The business lacks a senior technical leader able to assess the recommendation.

The assessment should be proportionate to the decision.

A specific concern may require a focused examination of one component, relevant development records and discussions with the team.

A major proposed rebuild could justify a much broader examination of architecture, dependencies, testing and business requirements.

Work With the Existing Team

Independent advice should not automatically create an adversarial relationship.

Developers and suppliers often hold valuable information about the application’s history, limitations and operational behaviour.

I would seek to understand their reasoning and review the evidence collaboratively.

A credible independent assessment should also identify where management practices, requirements or commercial decisions have contributed to the problem.

That provides a fairer and more useful outcome than concentrating only on source code quality.

Consider Ongoing Technology Leadership

If technical debt disputes keep recurring, the business may have a wider leadership problem.

Development priorities, technical standards, investment decisions and supplier accountability may not have clearly assigned owners.

In those circumstances, ongoing Fractional CTO support may help establish more consistent technical direction and executive oversight.

However, a recurring leadership engagement is not necessary simply because the business has technical debt.

A focused review, a clearer decision process and a practical improvement plan may be enough.

The recommendation should follow the problem rather than assume a particular service is required.

Frequently Asked Questions

How Can We Verify Technical Debt Claims?

Ask the developer to identify specific technical limitations, provide supporting evidence and explain the affected business functions. A qualified technical reviewer can help assess whether the findings justify the proposed action.

Can Technical Debt Cause Project Delays?

Yes. Technical debt can increase development effort, testing requirements and the risk of unintended defects. However, unclear requirements, poor estimates and weak delivery practices can cause similar delays.

Is Technical Debt an Excuse for Poor Delivery?

Not necessarily. The concern may be genuine, but the explanation should be supported by evidence rather than accepted automatically. Management should examine the technical findings alongside delivery and planning practices.

Should We Approve the Proposed Fix?

Approve substantial remediation only after understanding the problem, alternatives, expected benefits, delivery risks and uncertainty. Sometimes further investigation or a limited trial is the most sensible next step.

When Should We Seek Independent Advice?

Independent advice is particularly useful when development costs are increasing, suppliers disagree about the software’s condition or management is considering substantial remediation or rebuilding without sufficient technical evidence.

Conclusion

When developers blame technical debt for rising costs or slow delivery, the right response is to examine the evidence rather than accept or dismiss the explanation. If your business faces conflicting technical advice or substantial remediation proposals, my independent Software Development Review can help establish what is happening, assess the findings and clarify your options. Better decisions begin with a fair, evidence-based assessment of technical debt claims.

Share This Post

Need support with software delivery?

Software projects can quickly run into trouble when priorities are unclear, delivery slows down, or nobody has a clear view of progress.

If you need help getting a software project back on track, improving delivery, or creating greater accountability across your team, take a look at my Project Delivery service or Contact Us to start the conversation.

Iain White Software Engineering Consultant

Successful software delivery is about more than writing good code. It is about turning business priorities into working software without losing control of time, cost or quality.

Iain White has spent decades working with software teams, technology leaders and business owners across projects ranging from new digital products to complex business systems.

He helps organisations understand why delivery is slowing down, where risk is building, and what needs to change to get work moving again.

His approach combines hands-on software experience with project delivery and technology leadership. That means looking beyond individual technical problems to the wider issues affecting priorities, people, processes and decision-making.

Through White Internet Consulting, he helps organisations bring clarity to software delivery, reduce risk and give business leaders greater confidence that their technology projects are heading in the right direction.